12 September, 2024
Ciclo Fapril group's photovoltaic plant starts operating
Capwatt has started operating 6 self-consumption photovoltaic plants at the Ciclo Fapril group (PNH, Tabor, Tortec, CFCA, Alufap and Elevek), a reference in the metalworking sector with over 50 years' experience. With an installed capacity of 2120 kWp and a total of 4165 modules, these plants will produce around 2829 MWh of clean energy per year.
In the long term, these photovoltaic plants have the potential to prevent the emission of around 15,000 tonnes of CO2 over 25 years, consolidating a greener future for us all.